RFP / RFQ
2026:
RFP-RFQ 2026-006 Request for Qualifications & Proposals for Architectural and Engineering Services for Bacon Academy Roof & Mechanical Project (4/22/2026). RFP-RFQ 2026-006 Bid Form ATTACHMENTS: Bacon Academy Roof Drawings Bacon Roof Addendum 1 Bacon Roof Addendum #2 Bacon Roof Addendum #3 Bid Tallies
RFP-RFQ 2026-003 Colchester Exposing Paved Over Gate Boxes - Water & Sewer, Attachment A ADDENDUM #1 Site Walk Sign In Sheet ADDENDUM #2 Attachment A #2 Tabulation
RFP-RFQ 2026-001 Colchester Water and Sewer Easement Clearing, Attachment A, RFP 2026-001 Addendum #1, Pre-Conference Sign-In Sheet, Attachment A R1 Stellite and Streetview , Addendum #2 Tabulation
Colchester BOE RFQ-RFP for Energy Savings Performance Contracting Services
2025:
RFP-RFQ 2025-008 VFW and CPD Architectural Design, Attachment A existing floor plan, Attachment B preliminary design floor plan (10/8/2025) Addendum 1, Site Walk Sign in, Addendum 2, Addendum 3, SSG Personal-Locker Brochure, Additional Preliminary Sketch, Mystic Air Quality Report, Tabulation
RFP-RFQ 2025 - 007 Colchester Energy Broker (posted 9/19/25) Addendum 1, Tabulation
RFP-RFQ 2025 -006 Youth Center Structural Rehabilitation, Colchester Youth Center Bid Set, Attachment A (Structural Investigation), Attachment B (Historic Distric Handbook), Attachment C (Lead Test)
(posted 9/12/25) Addendum 1, Addendum 2, Addendum 3, CYC Temporary Shoring, CYC REV1, Tabulation
RFP-RFQ 2025-005 Senior Center Audio, RFP-RFQ 2022-013 Part A 1, RFP-RFQ 2022-013 Part A 2, Attachment B (posted 9/10/2025) Addendum 1, Addendum 2, Addendum 3, Tabulation
RFP-RFQ 2025 -004 (CT Source Posting RFP 028-2026.2) Commercial Reevaluation Services, Tabulation
RFP-RPQ 2025-003 (CT Source Posting RFP 028-2026.1) Residential Reevaluation Services, Tablution
RFP-RPQ 2025 002A Norton Park Phase 3, Attachments A and B (please see instructions in bid docs), Attachment C, Attachment D, Attachment E posted 08/01/2025 Addendum 1, Sign up Sheet , Addendum 2 Tabulation
RFP-RFQ 2025 002 Norton Park Phase 3, Attachments A & B (AutoCAD Files are available on demand: [email protected]), Attachment C posted 05/12/25 Attachment D, Addendum 1, Addendum 2, Addendum 3, Tabulation
RFQ-RFQ 2025-001 Design for Colchester Athletic Complexes, Attachment A, Attachment B posted 2/24/2025 Addendum 1, Attachment C, Addendum 2, Addendum 3, Modified Bid Form, Tabulation
2024:
RFQ-RFQ 2024-15 Cabin Rd Treatment Plant Upgrades, Cabin Rd plans, Cabin Rd Technical Specs posted 11/25/24 Addendum 1, Addendum 2, Addendum 3, Addendum 4, Tabulation
RFP-RFQ 2024-014 Former Norton Paper Mill Remediation Project INVITATION TO BID, Instructions to Bidders, Exhibit A Proposed Scope of Work, Exhibit A - Attachtment 1 Remedial Action Plan, Exhibit A -ATTACHMENT 2 (1)_011000 - General Requirements, Exhibit A- Attachment 2 (2)_020202 - Soil Erosion & Sediment Control, Exhibit A - Attachment 2 (3) _026113 - Excavation Handling and Disposal of Excavated Materials, Exhibit A - Attachment 2 (4)_026500 - Underground Storage Tank Removal, Exhibit A - Attachment 2 (5) _028432 - TSCA Regulated Materials Remediation, Exhibit A - Attachment 2 (6)_028433 - PCBs Less Than 50 PPM Remediation, Exhibit A - Attachment 3_Drawing Set, Exhibit A - Attachment 4 (1)_FMC Transmittal, Exhibit A - Attachment 4 (2)_FMC Application, Exhibit B-Bidding Documents List, Exhibit C- Bid Form & Schedule 1, Exhibit D-Project Signage Requirements, Exhibit E-Non-Collusion Affidavit of Bidder, Exhibit F-Wage Rates, Exhibit G-CHRO Contract Compliance Regulations & Notification to Bidders Form, Exhibit H-Corporate Resolution Statement posted 11/11/24 Addendum 1, Site Walk Sign in, Addendum 2, Addendum 3, Addendum 4, Tabulation
Colchester BOE RFQ-RFP for Bacon Academy HVAC Project Project Design Professional Services
RFP-RFQ 2024-013 Youth Center Updates and Abatement, Attachment A Historic District Handbook, Attachment B posted 9/16/2024 Addendum 1 Tabulation
RFP-RFQ 2024-012 Norton Park Phase 1 Site Development, Site Plans, Addendum #1 posted 9/6/2024 Addendum #2, Norton park dam access agreement and Plans, Norton Park September 2024 Site Photos, Norton Park Phase 1 area 12 6 23, Norton Park Test Well locations, Norton Park Topsoil seed limits, Technical-information-ASSET-DOC-LOC-17064686, Norton Park Pre bid Sign in sheet, Tabulation
RFP 2024-011 Recreation Laser Leveling, Attachment A, Addendum #1 posted 8/26/2024 Tabulation, Detailed Table of Bid Results
RFP 2024-10 Laser Leveling Rehab of Ball Fields, Attachment A, Addendum #1 posted 8/26/2024 Tabulation, Detailed Table of Bid Results
RFP-RFQ 2024-09 Youth Center Porch Restoration Project, Attachment A Historic District Handbook , Attachment B Existing Conditions/Illustration of Scope posted 8/22/2024 Addendum #1, Addendum #2 Tabulation
RFP-RFQ CPS- 426 Air Conditioning Upgrades to Improve Indoor Air Quality at Bacon Academy (Colchester Public Schools) posted 8/2/2024 Addendum #1 Tabulation
RFP-RFQ 2024-08 RecPlex Irrigation Wells, Attachment A, Attachment B, Addendum #1, Addendum #2
RFP-RFQ 2024 -07 Town of Colchester Operation of a Food & Soft Drink Concession at Colchester Recreation Complex posted 6/14/2024 Tabulation
RFP-RFQ 2024 - 06 Colchester Senior Center FFE - Project manual, RFP-RFQ 2024 - 06 Colchester Senior Center FFE - Invitation to Bid, RFP-RFQ 2024 - 06 Colchester Senior Center FFE - Drawings posted 6/12/2024 Addendum #, Tabulation, Recommendation Letter
RFP 2024-05 Lebanon Ave Streetscape Improvement Project, 20240521 FD PLANS Lebanon Ave Streetscape COLCHESTER, 20240606 FINAL Contract Documents LEBANON AVE COLCHESTER, Lebanon Avenue Streetscape CT DOT Standard Sheets, Addendum No. 1, Tabulation
RFP 2024-04 Town Street and Roads Snow and Ice Removal, Tabulation
RFP 2024-03 School Snow and Ice Removal, Addendum #1, Addendum #2, Tabulation
RFP-RFQ 2024-002 Colchester Senior Center - Commissioning Agent, Invitation to Bid, RFP 2022-013 Town of Colchester Senior Center Building#1, #2, Drawings_1, Drawings_2, Addendum #1, Addendum #2. RFI #1 with Responses, Insurance Requirements, Fixture, Furniture, Equipment BID Drawings, FFE Project Manual
RFP 2024-001 Exterior Recoating of 40' Water Tank , Technical Specs with Inspection Report, Addendum #1, Addendum #2, Tabulation
2023:
RFP 2023-006 Civil Design Services for Norton Park - Phase 1, Addendum #1 Tabulation
RFP 2023-005 Electrical Service Upgrades associated with the Town Green Bicycle and Pedestrian Improvements Project. Addendum #1
UPDATED - RFP 2023-004 Town Hall Roof, Town Hall Roof Drawing #1, Drawing #2, Drawing #3. Drawing #4 , Addendum #1 Addendum #2. Tabulation.
RFP 2023-003 Construction of Trail Head Parking Lot, Middletown Road/ Route 16 Sablitz Open Space Property, Bid Form, Map, Addendum # 1. Addendum # 2. Tabulation.
RFP 2023-002 Rehabilitation of Fire Headquarters Parking Lot. Tabulation.
RFP 2023-001 Town of Colchester HVAC Repair, Addendum #1, Addendum #2. Addendum #3. Tabulation.
RFP 2023-000 Colchester Town Green - Gazebo Repairs. Tabulation.
2022:
RFP 2022-014 Town of Colchester: Comprehensive Banking Services.
RFP 2022-013 Town of Colchester Senior Center Building#1, #2, Drawings_1, Drawings_2, Addendum #1, Addendum #2. Tabulation.
RFP 2022-012 Salt Shed Roof Replacement. Tabulation.
RFP 2022-011 Washbay Ceiling Replacement. Tabulation.
RFP 2022-010 Road Repair and Paving. Tabulation.
RFP 2022-009 - Adolescent Community Based Counseling Services. Tabulation.
RFP 2022-008 - Post-Tension Concrete Tennis Court Project At Colchester Recplex, Addendum #1, Addendum #2, Addendum #3. Tabulation.
RFP 2022-007 Roof and Soffit Repair: Company #2 Firehouse. Tabulation.
RFP 2022-006 Rehabilitation of Fire Headquarters Parking Lot. Tabulation.
RFP 2022-003 Playground Equipment and Design and Installation Bid Opening Tabulation
ITB 2022-005 Colchester Youth Center Roof and Soffit Repair Project, Bid Form Photos. Tabulation.
RFP 2022-004 - Irrigation Design and Installation at the Colchester RecPlex, Addendum #1A, Addendum #1B , Addendum #2
RFP 2022-003 - Playground Equipment Design and Installation at Colchester RecPlex
RFP 2022-002 - Operation of a Food & Soft Drink Concession Colchester Recreation Complex
RFP 2022-001 - Project Consultant for Use of ARPA Funding, Addendum #1, Addendum #2
2021:
RFP for Development of Affordable Housing Plan, Addendum, Bid Opening
Invitation to Bid Fire Deparmtent - Tower - Instructions to Bidders, Bidders Check List, BID FORM, Tower Specifications, Bid Opening
Invitation to Bid Fire Department - Tanker - Instructions to Bidders, Bidders Check List, BIDFORM, Chassis Specifications, Tanker Specifications, Bid Opening
Invitation to Bid Fire Department - Engine Pumpers - Instructions to Bidders, Bidders Check List, BIDFORM, Engine 2021 Specifications, Bid Opening
RFP for Bike and Pedestrian Project, Addendum #1, Addendum #2, Bid Sheet
RFP 2021 - 03 Sewer Line Repair Airline Trail, Rapallo Viaduct Drawings, Rapallo Viaduct Addendum No. 2, Sewer Line Addendum 3, Bid Opening July 16, 2021, Bid Result Breakdown
RFP Demolition Services, Westchester Road, Mill Street, Pos Pre Demo Westchester and Mill, Bid Opening July 23, 2021
RFP 2021 - 03 Sewer Line Repair Airline Trail, Rapallo Viaduct Drawings, Rapallo Viaduct Addendum
Colchester Public Schools Pictures RFP 2021
RFP 2021 - 1 RFP Roofing and Soffit Repair Colchester Youth Center, Current Photo of Building, Old Photo of Building, Front of Building, Rear of Building, East Side, West Side, Youth Center LTCIP
Colchester Public Schools Special Education Transportation
Bacon Academy Yearbook RFP 2021, RFP Addendum
2019-2020:
Senior Center Building Project Managers Rebid, GIS Clip, Strategic Plan, Survey Map, Town Hall Site Plan, Town of Colchester GIS Clip, Amendment #001 - Questions Answered, Bidders List
RFP 2020-08 School Snow and Ice Control 2020-2023, Bid Results
RFP 2020-09 Snow and Ice Control Services
Fire Company 1 RFP, Bid Results
Force Main Repair - Engineering Services RFP, Bid Opening
Colchester 2021 Residential Revaluation RFP, Bid Opening
Colchester 2021 Commercial Revaluation RFP, Bid Opening
Town of Colchester Audit RFP
Paper Mill Invitation to Bid, Bid Results
Halls Hill Bid Opening
| Attachment | Size |
|---|---|
| 226.6 KB | |
| 2.24 MB |
